Process solutions built around your material and target output
HNLANGBO coordinates crushing, screening, sand making, mobile processing and mineral preparation equipment around confirmed feed data, capacity, finished-product requirements and site conditions.
Technical coordination for different project roles
Clear responsibilities and a defined information path help every project move from an initial enquiry to a practical equipment proposal.
Mining & Quarry Operators
Equipment selection aligned with material characteristics, required throughput, finished grading and operating conditions.
Engineering & Project Companies
Process review, equipment boundary clarification, technical documents and quotation coordination for project planning.
Distributors & Local Partners
Application support, product information and factory coordination for customer enquiries in local markets.
Quarry & aggregate production
A practical crushing circuit starts with rock properties, maximum feed size, required tonnes per hour and target aggregate sizes—not with a catalogue model alone.
Feed → primary crush → secondary crush → screen → graded aggregate- Primary, secondary and tertiary crushing stages
- Controlled feeding, screening and recirculation
- Stationary or mobile configurations according to the site

Manufactured sand production
Sand quality depends on feed grading, shaping, classification, fines control and washing conditions. Available water and recovery requirements should be reviewed at the beginning.
Shape → classify → wash → recover fines → dewater- VSI shaping and controlled sand grading
- Wheel or spiral washing according to duty
- Fine-sand recovery and water-management coordination

Construction-material recycling
Incoming material composition, steel, soil and other contamination must be identified before a mobile or stationary recycling arrangement is selected.
Pre-sort → feed → crush → screen → recovered material- Mobile jaw or impact crushing for changing work faces
- Scalping and screening for material separation
- Equipment protection planned around contamination risk

Mineral-processing preparation
Grinding and separation equipment must be selected around ore analysis and response. Recovery and concentrate grade cannot be confirmed without suitable test data.
Reduce size → grind → classify → separate → recover- Ball milling and grinding-stage review
- Flotation or magnetic separation according to ore response
- Testing requirements clarified before final selection

From equipment direction to coordinated supply
Scope is confirmed for each project so the proposal clearly identifies what HNLANGBO supplies and what must be provided locally.
Process & Equipment Review
Review of feed conditions, process stages, equipment configuration and preliminary production logic.
Technical Proposal
Equipment list, duty information, quotation coordination and available technical documentation for the agreed scope.
Delivery & Service Coordination
Production follow-up, shipment preparation, manuals, spare-parts communication and agreed commissioning assistance.
A clear route from enquiry to equipment proposal
Each stage resolves a different technical question before the equipment scope is confirmed.
Share Project Data
Material, feed size, capacity, finished product, country and available utilities.
Review the Process
Confirm the production route, duty conditions, interfaces and missing technical information.
Configure Equipment
Select equipment stages and prepare the preliminary supply scope for discussion.
Confirm the Proposal
Clarify specifications, commercial terms, delivery information and responsibilities.
Information required before final selection
Catalogue ranges support early planning. The final configuration and performance commitments require confirmed project data.
| Review area | Information to provide | Why it matters |
|---|---|---|
| Material & feed | Material name, analysis, hardness or compressive strength, moisture and maximum feed size. | Determines equipment suitability, wear selection and feed opening. |
| Capacity & product | Target tonnes per hour, operating hours and required finished sizes or grade. | Defines stage configuration, equipment size and screening duty. |
| Site & utilities | Country, altitude, footprint, access, electricity, water and environmental conditions. | Affects motors, controls, layout, structures and supporting systems. |
| Supply boundary | Delivery destination, local-work scope, installation responsibilities and document requirements. | Clarifies quotation boundaries and project coordination. |
Common project-planning questions
Can HNLANGBO provide a complete production-line proposal?
Yes. HNLANGBO can review the required process and coordinate feeding, crushing, screening, conveying, sand making, washing, grinding or separation equipment within the agreed supply scope.
Is catalogue capacity the final plant output?
No. Actual plant output depends on feed properties, feed grading, moisture, equipment settings, circuit arrangement, operating conditions and the required finished product.
When is material testing required?
Testing should be considered when ore recovery, concentrate grade, separation response, unusual moisture or uncertain material behaviour affects equipment selection or performance.
Can a proposal be prepared without final site drawings?
A preliminary direction may be discussed from basic project data. Final configuration, interfaces and responsibilities require confirmed site conditions and layout information.
Does HNLANGBO coordinate installation and commissioning?
Manuals, technical communication and agreed commissioning assistance can be included. Local civil works, utilities, lifting, labour and site safety responsibilities must be defined in the proposal.
Start with your material and required output
Send the available project information for a technical review. If some data is not yet confirmed, explain the current project stage and the HNLANGBO team will identify the next information required.
- Material and maximum feed size
- Target capacity and finished-product specification
- Project country, site conditions and utilities
- Requested equipment or complete-process scope
Final equipment selection and performance commitments are confirmed in the agreed technical proposal.
